Project |
Contract Value
in
Crore (Rs.)
|
Stage 3 Pumping station (5X30 MW) of Kalwakurthy Lift
irrigation Scheme. |
631.99 |
Brahmaputra Bridge near Guwahati on NH-31 in Assam |
238.34 |
Design and Construction of complete new 107 MLD capacity potable
Water Supply Infrastructure Project on Turnkey basis for Guwahati City |
349.7 |
Construction of Bridge and its approaches over river Yamuna D/s of
existing bridge at Wazirabad, Delhi |
631.81 |
Turnkey EPC Contract for Civil, Structural, Architectural & allied
Works for 2X520 (1040) MW Thermal Power project at Vishakhapatnam (A. P.) |
267 |
Punatsangchhu - II Hydroelectric Project (990 MW) – Contract
Package # C-2: “Construction of Headrace Tunnel (HRT) from Adit – I & Adit – II” |
398.32 |
Improvement/Upgradation of Birpur-Balua-Jadia
Meergunj-Murligunj-Udaikishangunj Road (SH-91) Length – 101.7 Km. Contract
Package No. - 4 of BSHP-II. |
328.89 |
Execution of Electro Mechanical Works for Development of 66 MW
Rangit-II, Hydro Electric Project at West Sikkim |
104 |
Construction of Head Race Tunnel including Construction Adits (I,
II, III, IV&V) and Associated Works of HRT of Mangdechhu Hydroelectric Project
Bhutan |
343.11 |
Package JMS-2: Construction of Behala Bazar, Taratala and Majerhat
Stations including all related works (Architecture, Electrical & mechanical,
HVAC, Fire Detection and Fire Suppression System and Public Health Engineering)
in Joka-BBD bag Corridor of Kolkatta Metro Railway line |
162.67 |
Design, Engineering, Procurement of Materials & Equipment,
Construction and All other works and things necessary for completion of the
Project of Four Laning of National highway No. 75-E including the Section from
KM.83/4 to KM 195/8 (apprx. 102.60 KM) on Sidhi Singrauli Section in the State
of Madhya Pradesh |
900 |
Construction of Coffer Dams, Diversion Tunnel, Concrete Dam
including Spillway, Power Intake, Part HRT (upto RD 6347m) and Construction
Adits: under Main Civil Works Package – Lot 1 for 180 MW Bajoli Holi HEP,
Himachal Pradesh, India |
369 |
Narmada Gudhamalani Water Supply Project |
121.48 |
Approach Road & Bridges at Baluaha Ghat, Bihar |
231.15 |
Main Civil Works Package For 180 MW Bajoli Holi HEP, Himachal
Pradesh, India |
400 |
Tonk Water Supply Project. |
245.39 |
Construction of Balance Civil Works of HRT by TBM (Lot PB 2A) of
Parbati HE Project-Stage-II |
447.74 |
Pokaran Water Supply Project |
392.66 |
Construction of Elevated Road Corridor from AIIMS (on NH-98) to
Digha (On Ganga Path) (11.90 Km) at Patna in the State of Bihar on Engineer
Procurement and Construction (EPC) mode (the “Project”) |
717.4 |
Jawai Water Supply Project |
315.5 |
Execution of balance civil works related to concrete dam, diversion
works, intake and 1.35 Km HRT of Vyasi H.E. Project (120 MW) in District
Dehradun |
317.05 |
Natural Draught Cooling Towers and Cooling Water Pump house Package
for RAPP-7&8 including allied works |
648.39 |
Package ANS-2: Construction of Seven (07) Stations Including
Related Works from Barun Sengupta to Bidhan Nagar in New Garia-Airport Metro
Corridor of Kolkata metro Railway Line |
338.96 |
Western Dedicated Freight Corridor -Special Steel Bridge Contract
Package – 3A (R) (ICB No. CT P-3A |
157.95 |
4 laning of NH-37A from KM 0.00 (Kaliabor Tiniali Road Junction) to
KM 17.300 (Dolabari Road Junction) including Construction of New Brahmaputra
Bridge on EPC Basis in the State of Assam under Phase A of SARDP-NE |
588.95 |
Channelization of Gomti River (FROM HARDING BRIDGE TO WEIR) |
516.73 |
Construction, Operation and Maintenance of balance works for 4 laning of NH-17B from
Varunpuri to Sada Junction and Elevated road cum Flyover cum ROB from Ravindra Bhavan junction to Gate No.09
of the MPT including its loop connectivity ramps in the State Of Goa.) |
397 |
Four Laning of Udhampur to Ramban Section of NH-1A in the State of Jammu & Kashmir Under NHDP Phase-II |
1709.99 |
Four laning of Hospet-Bellary-Karnataka/AP Border from Km 280.080 (Design Ch.) to Km. 375.450 (Design Ch.), design length 95.370, NH-63 in the State of Karnataka under NHDP Phase – IVB on EPC mode. |
870 |
Construction of South side Approach road of Digha Rail-Cum-Road bridge from AIIMS (on NH98) to Digha including elevated structure over Ashok Rajpath and remaining Elevated Structure upto Digha Rail-Cum-Road {NHAI Leftover Portion} (Ch.0.00 to Ch. 2.6000, Ch. 3.400 to Ch.11.344 and Ch. 12.270 to Ch. 12.420) at Patna in the State of Bihar on EPC Mode. |
157.14 |
Construction of Partially Access Controlled Four lane Elevated Highway between Samrala Chowk to Ludhiana Municipal Limit of NH-95, Punjab. |
756.27 |
Rehabilitation & Upgradation of Two laning of Maheshkhunt-Saharsa-Purnea section of NH 107 from km. 90.000 to km. 177.960 in the State of Bihar on EPC Mode-Package-II. |
736.01 |
Civil works of SMS-II project (BOF & CCP) for 5-10 MTPA
Expansion Project at JSW Steel Ltd., Dolvi |
208.02 |
Balance works of Regional water supply schemes of 199 villages and their habitations of P.S Jawaja , Tehsil Beawar District Ajmer, on Fluoride Control Project on Single responsibility turnkey basis i.e., Design Build and 1 Yr. Defect Liability and 9 Yr. Operation & Maintenance. |
174.45 |
Construction of balance works of tunnel T-48 (between Km 100.000 to 110.200 approx) on Katra-Banihal Section of Udhampur- Srinagar-Baramulla New BG Railway line project (Package Tunnel T-48R) |
1170.32 |
Construction of 4-Lane NH-29 Bypass, Phase-II connecting NH-29 with NH-2 as part of Varanasi Ring Road, Design Chainage km 30.600 to km 57.320 in the State of Uttar Pradesh under
NHDP Phase-VII, on EPC mode |
949 |
Construction of proposed 6 Lane Elevated Connector between Belghoria Expressway and Kalyani Expressway including widening of Kalyani Expressway to 6 Lane from Nimta to Muragacha (Total Length 4.565 Km) (Phase - I) on EPC Mode in the District of North 24 Parganas in West Bengal. |
494.99 |
Mizoram Road Project-(NH-54)-(Pkg-II), Mizoram |
512.00 |
Sivok Tunnels T1 & T2 |
595.86 |
Kosi Bridge Project-(NH-527), Bihar |
1101.99 |
NDCT @ 2x660 MW Udangudi STPP.2 |
165.95 |
Construction of balance civil works package : Lot-II for underground power house and transformer cavern, Part of HRT - I & HRT - II, Surge Shafts, Presuure Shafts, and ADITs. TRT and other Associated Structures etc. of Teest - VI HE Project, Sikkim |
1248.4 |
Execution of 1500m Head Race Tunnel Works of Parbati-II HE Project, (LOT PB-2C) |
211.64 |
Construction of Civil , Architectural, Mechanical, Electrical, C&I and Other Allied Works of Natural Draught Cooling Towers (2 NDCTs) including Supply of Materials, Labour, Tools & Plants, etc. required at Package 2 for 5 x 800 MW Yadadri STPP, Telangana |
189.8 |
Rengali Irrigation Project |
230.94 |
Kohima New BG Line T-17, 18, 19 |
139.31 |
Rehabilitation & Upgradation Of Existing Road Between Km 29.725 To Km 60.550 (Suraithota - Malari) NHSL To Double Lane Specification On Joshimath – Malari (NH- 107B) Road On EPC Mode In The State Of Uttarakhand (Length 30.825 Km). BRO Shivalik, Suraithota-Malari |
131.25 |
Rafiabad-Chamkot (RKCTC NH-701 PKG-1) |
473.25 |